[Road of SKYSQUARE-030-] Soil Improvement!! ~Ground~
All posts
[Road of SKYSQUARE-030-] Soil Improvement!! Ground
Hello
This is Nakajima from AZSTOKE Co., Ltd.
This is the purpose of this project.
We will prepare the ground through ground improvement work!!
This mud became a big problem in the previous blog " [Road of SKYSQUARE-029-] Emergency!! Mud Land "
The only way to solve this problem is to improve the ground, so this time we asked a contractor to do it.
I had one section handled.
We will then take various measures ourselves to ensure that prefabricated buildings can be placed on the prepared ground.
This time we will be reporting on the event.
Click here for a list of previous SKYSQUARE Road articles
Table of Contents
\1. Request ground improvement work from a contractor
\2. Use a weed control sheet to prevent weeds from growing.
\3. This will apparently make the ground even stronger!!
\4. Install on top of the weed control sheet
\5. Install weed control sheets near the entrance
\6. After wrapping the crushed stone, compact it
\7. It's finally ready!!!
1. Request ground improvement work from a contractor
This time, we asked a contractor to improve the ground only in this section. Professional work is amazing. We confirmed that the ground was flat, clean, and solid.
It's so beautifully made, I'd love to know how they managed to make it so flat.
However, we can now finally move forward.
2. Use a weed control sheet to prevent weeds from growing.
First, we put down a weed control sheet to prevent the grass from growing. We needed some manpower, so we asked our staff member, Takeda, to come and work on the weekend.
It's very helpful as it holds things up nicely.
I leave the weed control sheet to Takeda and head to the quarry in my truck to buy some crushed stone.
3. This will apparently make the ground even stronger!!
It seems that adding the following products when laying crushed stone will create a stronger foundation, so it is safe for a 10-ton truck to drive on.
After struggling with the mud, I wanted to prevent the tires from getting lost again.
We decided to try putting this in here.
*I don't know how effective it will be, but when I imagine adding crushed stone, it certainly looks strong, so I decided to introduce it.
◇Product: " Gravel Grid Pavement Stabilizer "
Since the excavator will be moving around, the ground needs to be strong enough to withstand the movement of an 8-ton excavator, so simply improving the ground alone is questionable, so we will make it even stronger by adding crushed stone and this product.
4. Install on top of the weed control sheet
Place the stabilizer neatly on top of the weed control sheet and wrap crushed stone on top of it.
As usual, we purchased RC40 crushed stone by truck and placed it into the diamond-shaped stabilizer. This seems to help the ground to be firmly compacted.
5. Install weed control sheets near the entrance
Here too, we lay down a weed control sheet and wrap it with crushed stone. Because cars will be driving through the area, if we leave it as it is, there will be tire marks and excavator tracks, so we have to put in the gravel.
6. After wrapping the crushed stone, compact it
Now that we have finally rolled out the minimum amount of crushed stone, we will use a compact plater to compact it thoroughly.
We continue to apply compaction.
When I first used the compact plater, it got completely stuck on the soil and I had a lot of trouble. This time, I was using crushed stone, and it was a piece of equipment used for compacting in situations like this.
The previous one was simply wrong...
7. It's finally ready!!!
After repeatedly rolling crushed stone and compacting it, the area was finally, at a minimum, ready to welcome the container house.
It was long.
After clearing the land, which was overgrown with trees, and improving the ground, we finally got to this point.
Next time we will finally install the prefabricated building!!!
We will continue to forge ahead on the path of SKYSQUARE.
SKYSQUARE Article List
[Road of SKYSQUARE-029-] Emergency!! Mud Land
[Road of SKYSQUARE-028-] How to Build a Base Root Cutting🌳
[Road of SKYSQUARE-027-] How to build a base Logging🌳
[Road of SKYSQUARE-026-] First truck name of ownership change🚚
[Road of SKYSQUARE-025-] Let's make this our base!!!
[Road of SKYSQUARE-024-] The 10th license is a national qualification!!!
[Road of SKYSQUARE-023-] It's free to live in three locations!!
[Road of SKYSQUARE-022-] My new favorite car 🚚 3t dump truck!!
[Road of SKYSQUARE-021-] A tough battle!! It took 4 days to change the bucket of a heavy machine?
[Road of SKYSQUARE-020-] I really want a slope bucket!!
[Road of SKYSQUARE-019-] Crushed stone goes to the quarry - many trials
[Road of SKYSQUARE-018-] Pallet tent ⛺
[Road of SKYSQUARE-017-] Extra-large 30m soundproof wall "Complete"!!
[Road of SKYSQUARE-016-] An extra-large 30m soundproof wall just for sound!!
[Road of SKYSQUARE-015-] 9th license!! Obtained!
[Road of SKYSQUARE-014-] 9th license!! Let's get it!
[Road of SKYSQUARE-012-] Creating a huge pit in SKYSQUARE - Let's try digging it first -
[Road of SKYSQUARE-011-] Forestry training day 2 report released!!!
[Road of SKYSQUARE-010-] Forestry training first day report released!!!
[Road of SKYSQUARE-009-] Trying to make a DIY portable toilet!!!
[Road of SKYSQUARE-008-] We successfully repaired the engine malfunction of the excavator!
[Road of SKYSQUARE-007-] Foley parts secured!! Get a scrapped car
[Road of SKYSQUARE-005-] Slinging license obtained!!!
[Road of SKYSQUARE-003-] Major expansion from about 3000㎡ to 6000㎡!!!
[Road of SKYSQUARE-002-] The only way to move forward is to buy it!!!