SKYSQUARE

[Road of SKYSQUARE-015-] 9th license!! Obtained!

All posts

9th license!! Obtained! 9th license!! Obtained!

Hello

This is Nakajima from AZSTOKE Co., Ltd.

I have finally started working on my ninth license, and have finished the theoretical part and today I will finally be taking the practical part.

If you hold a large special vehicle license, you are eligible for some exemptions, so you can obtain the off-road vehicle license in just two days.

The exam consists of both written and practical skills, and you can obtain a license by passing both.

Classes start at 8:25 in the morning, so I arrive at 8am.

Arrived at 8am Arrived at 8am


License list


  1. Large special vehicle license
  2. Large vehicle type 1 license
  3. Towing license
  4. Vehicle construction machinery (land leveling, etc.)
  5. Vehicle construction machinery (new dismantling)
  6. Felling trees, etc.
  7. Small Mobile Crane
  8. Slinging
  9. Off-road transport vehicle ⇐ I'm here now

Click here for a list of past SKYSQUARE Road articles

SKYSQUARE


■ Table of Contents

  1. Day 2: Practical

  2. Day 2: Lunch is a bento lunch of the day

  3. Day 2: Practical exam at the end


■ Day 2: Practical

On the second day, the practical training will be conducted using the YANMERC30R.

After listening to the teacher's explanation, we have a demonstration and practice is the key, so we watch other students use the machine, do image training and repeat the practice.

This aircraft has a loading dump truck at the front, so moving forward is similar to backing up a truck.

The right side of the photo looks like it's the front, but the left side is the front.

The movement controls seem to be a bit tricky, as even when you move straight it will sometimes curve a little, and everyone had a hard time with that.

However, as the second half progressed, everyone got better and seemed to have got the hang of it.

Rough terrain transportation practice Rough terrain transportation practice

■ Day 2: Lunch is a bento lunch of the day

I bought the daily bento for lunch again today.

After all, 400 yen is pretty cheap.

In the previous version, the lunch boxes were not recyclable, so I felt that the company was making an effort to reduce waste by collecting and reusing them to further improve the side dishes.

The side dishes are even more naughty than yesterday, and I'm happy that we're working outside.

Daily bento Daily bento

■ Day 2: Practical exam at the end

The practical exam will be held in the fifth hour after the four-hour practical training.

The exam was a little nerve-wracking, but I managed to pass it safely!!!

I passed both the written and practical exams .

One more step forward towards realizing this goal.

The words "off-road transport vehicle" are printed underneath the sling that was acquired last time.

Driver's license Driver's license

> 3:30 p.m.

Even after completing the practical exam and the test, it was still before sunset when I got home.

I was able to get the license in just two days, but fatigue builds up quickly, so getting a three-day license is quite tiring.

I'm feeling a bit tired or a bit sick with a cold, so I'm going to rest.

thank you very much.

I'll come back later.

Kobelco Ichikawa Center Kobelco Ichikawa Center


SKYSQUARE Article List


[Road of SKYSQUARE-014-] 9th license!! Let's get it!

[Road of SKYSQUARE-013-] Building a base in SKYSQUARE - Leveling the ground is a mountain of problems -

[Road of SKYSQUARE-012-] Creating a huge pit in SKYSQUARE - Let's try digging it first -

[Road of SKYSQUARE-011-] Forestry training day 2 report released!!!

[Road of SKYSQUARE-010-] Forestry training first day report released!!!

[Road of SKYSQUARE-009-] Trying to make a DIY portable toilet!!!

[Road of SKYSQUARE-008-] We successfully repaired the engine malfunction of the excavator!

[Road of SKYSQUARE-007-] Foley parts secured!! Get a scrapped car

[Road of SKYSQUARE-006-] Plan to create a huge pit!!! Civil engineering work requires notification of buried cultural property excavation

[Road of SKYSQUARE-005-] Slinging license obtained!!!

[Road of SKYSQUARE-004-] Creating a facility where people can stay!!! First of all, how do you apply for tree cutting?

[Road of SKYSQUARE-003-] Major expansion from about 3000㎡ to 6000㎡!!!

[Road of SKYSQUARE-002-] The only way to move forward is to buy it!!!

[Road of SKYSQUARE-001-] Large-scale recording field starts

All posts