SKYSQUARE

[Road of SKYSQUARE-016-] An extra-large 30m soundproof wall just for sound!!

All posts

An extra-large 30m soundproof wall just for sound!! An extra-large 30m soundproof wall just for sound!!

Hello

This is Nakajima from AZSTOKE Co., Ltd.

SKYSQUARE is a recording studio where sound can be recorded , but capturing the best sound is not just about having a location.

In order to capture the best possible sound, it is necessary to configure the sound inside the huge recording pit to have the appropriate resonance, and since the purpose is to create a field for recording sound, it is necessary to shut out unnecessary external sounds.

This will not only involve the huge pit we introduced the other day, but we will also be using a variety of other techniques to create a sound field that can be fully utilized for recording.

Following the giant pit, work has begun on the installation of a 30m soundproofing wall.

We also plan to have a security gate and parking lock chains installed at the same time.

This blog will tell you about the progress along the way.

The construction schedule is shown in the map below.

①30m soundproof wall

②Accordion gate

③Parking lane

Construction plan map

Click here for a list of past SKYSQUARE Road articles

SKYSQUARE


■ Table of Contents

1. Ground preparation: Excavation

2. Ground formation: Concrete

3. Installing the supporting pillars

4. Install the walls


1. Ground preparation: Excavation

Since we will be installing a 3m-high wall, we will need to dig a large hole.

Start of drilling

The excavation is about 1m wide.

Width 1m

The height is set to 80cm.

Length 1m

Similar holes are set at equal intervals over a 30m area to keep the surface level.

A round mold for installing a pole was placed in the hole.

Drilling at equal intervals

2. Ground formation: Concrete

The concrete has been poured and a sizable foundation has been set.

Pour the concrete

It appears that they are making sure the poles are level as they go.

Leveling

The ground is filled with concrete at equal intervals over a distance of 30m.

Wait for it to harden.

The foundation is complete

3. Installing the supporting pillars

Once the ground had settled, the pillars were installed.

I can imagine soundproofing walls being installed here.

The photo shows our own excavator, and by making it available we were able to reduce the price a little.

I didn't realize there would be such benefits to buying it.

It was a pleasant surprise.

Installing the supports

4. Install the walls

Once the walls were attached, the look came together instantly.

The pits are well hidden so it looks pretty good.

This looks promising!!

Install the panel

It's still under construction, but it should be completed in a few days, so I'm really looking forward to it.

It is necessary to verify how much the noise of the sound has changed.

I will check it carefully before proceeding.


SKYSQUARE Article List


[Road of SKYSQUARE-015-] 9th license!! Obtained!

[Road of SKYSQUARE-014-] 9th license!! Let's get it!

[Road of SKYSQUARE-013-] Building a base in SKYSQUARE - Leveling the ground is a mountain of problems -

[Road of SKYSQUARE-012-] Creating a huge pit in SKYSQUARE - Let's try digging it first -

[Road of SKYSQUARE-011-] Forestry training day 2 report released!!!

[Road of SKYSQUARE-010-] Forestry training first day report released!!!

[Road of SKYSQUARE-009-] Trying to make a DIY portable toilet!!!

[Road of SKYSQUARE-008-] We successfully repaired the engine malfunction of the excavator!

[Road of SKYSQUARE-007-] Foley parts secured!! Get a scrapped car

[Road of SKYSQUARE-006-] Plan to create a huge pit!!! Civil engineering work requires notification of buried cultural property excavation

[Road of SKYSQUARE-005-] Slinging license obtained!!!

[Road of SKYSQUARE-004-] Creating a facility where people can stay!!! First of all, how do you apply for tree cutting?

[Road of SKYSQUARE-003-] Major expansion from about 3000㎡ to 6000㎡!!!

[Road of SKYSQUARE-002-] The only way to move forward is to buy it!!!

[Road of SKYSQUARE-001-] Large-scale recording field starts

All posts